.. | ||
img | ||
default.FCStd | ||
README.md |
The ballscrew holder
Part is fully parametrized, refer to the Spreadsheet to adjust values
Part anatomy
The part is sliced into 4 "levels" each being a dependent Datum Plane:
and separated into 2 semi-indepent parts that are Loft-ed together:
Fabrication
The part is expected to be on each side of the CNC:
THE SECOND PART NEEDS TO BE MIRRORED!!!
Known issues
1. irregularities with ballscrew mount
I am unable to fit the part to the ballscrew holder without making changes in the parametrization of the relevant part:
the other side experiences the same issue